2010 Seminars Programme l'Algerian Petroleum Institute,IAP, Recruits
TRU Drilling, Production & Reservoir Engineering

Contacts:

Head of Drilling, Production & reservoir Engineering TRU
Phone/Fax: 00.213 (0) 24 81 50 07
Network: 2106 - 3152
Email: Clic here


Laboratories:

DRILLING & WELL CONTROL SIMULATOR
Phone/Fax: 00.213 (0) 24 81 63 88
Network: 2106 3052
Email: abdelhamid.moulla@iap.dz

ACCREDITED CENTRE
- Accreditation Partner : International Well Control Forum (Scotland )
- Certified Centre ISO 9001 / 2000
- Surface & Subsea Programmes

SIMULATOR FEATURES
- Model Drillsim 5000 ( UK)
- Full Size

SCOPE OF SIMULATIONS

- Blow out Prevention and Well control System
- Rig instrumentation and Auxiliary Systems
- Equipement and Operational Malfunctions
- Downhole Effects
- Well Control
- Workover
- Cementing

TRAINING PROGRAMMES

- IWCF Certification for Drillers and Supervisors (Field Operators Staffs)
- Demonstration of Principles for Students
- Entry Level Training






Future actions:
1. Room of Simulation software:
This room will be available soon for simulations using the specialities’software, actually in the course of acquisition:

- Acquisition of Drilling/Production/Reservoir Engineering software.


2. Acquisition of the Laboratory of Soil mechanics:

• Granulometric analysis ‘all types of soils’
• Sedimentometry analysis (Hydrometer from 0,995 to 1,038 g/ml)
• Test of compaction (Proctor Test) ‘all types of grounds, variable depth reaching 04 m maximum’
• Odometric consolidation test
• Strength test: apparatus of direct shearing provided with a Cell of shearing (50 mm)
• C.B.R Test
• Triaxial/direct shear Test ‘cell for sample of 50 mm’ (Press of containment applicable by hydraulic cylinders).
• Measure of relative density
• Atterberg Measure limits: Manual and motorized Standard apparatus provided with smooth cups
• Permeability Measure (permeability cell with constant and variable load)
• Specific Weight Measure
• Specific Water Measure
• Triaxial Material Control/Oedometry/direct Shearing
• Control of the excavations compaction (light dynamic portable Penetrometer for all the types of soils), variable Depth reaching 04 meters maximum.
* Training: Practical work for the students.